Completed MBD Ground Floor male Toilet Pipe work modifications

What our Client said:

“Having undertaken the decision to replace the pipe work, with an increase to the fall on the horizontal waste line, and create sweeps leading from the toilets to the main waste line, on behalf of the Bank Of American Merrill Lynch CBRE Engineering team, I would like to congratulate IMS on the job well done so far.

We have seen a dramatic reduction in blockages to the floor, this is trended by ourselves and the significant reduction of downtime noted by our clients on the floor and with the Engineering team as a whole.

Works were completed on schedule to a good standard of workmanship, with minimal disruption to the client. This has been a real success story and as an extension of our arm, would like to share the success with IMS Environmental.”

Mr J Sharp