IMS Group, were tasked with constructing a temporary mortuary within a London Hospital.
The difficulties that IMS Group had to over come was the lack of ventilation within the designated area. Due to the critical nature of these works IMS Group had to work with close proximity with the Trust and FM supplier acting not only as a installer but a consultant covering a complete package on the installation.
A temporary air flowed containers were installed, the rooms was blacked out with specific locks and private viewing areas created.